Service area: City of Roseville
Concrete delivery inside Roseville city limits
Roseville is home base for us. This page is for job sites inside the City of Roseville, including West Roseville and the Fiddyment Farm area, and what the City asks of a pour there. Many homes outside the city may have a Roseville mailing address, and other agencies provide municipal services there.
Inside or outside the city
The City of Roseville keeps a Know Your Boundaries map that shows whether an address is inside or outside city limits, and it explains why people get caught out: the Postal Service sets city names and ZIP codes for mail delivery, not by city boundaries, so some homes in unincorporated Placer County use Roseville in their mailing address. Granite Bay is unincorporated Placer County. Antelope, across the county line, is in Sacramento County. Neither follows the City’s rules, so check the map before you look up a permit. Our Granite Bay page covers the County side.
West Roseville and Fiddyment Farm
West Roseville is inside the city. The West Roseville Specific Plan covers 3,162 acres west of Fiddyment Road that were annexed into the City from unincorporated Placer County, and the City places its Gray Park in the Fiddyment Farm area. Jobs there follow the same City permits as the older neighborhoods.
Driveways, walks and low walls
The City’s permit-exemption handout lists sidewalks and driveways not more than 30 inches above adjacent grade, not over any basement or story below and not part of an accessible route, among the work that needs no building permit. Retaining walls not over 4 feet, measured from the bottom of the footing to the top of the wall, are on the same list unless they support a surcharge or impound Class I, II or III-A liquids. For work that does need a building permit, the City points applicants to its Development Services online permit center and its Online Permitting Services (OPS) Portal.
At the street
An encroachment permit is required for improvements or staging construction in the public right-of-way, and the City lists sidewalk repair among that work. Engineering reviews the application, which asks for a certificate of insurance, a plan showing the location and limits of the work, and traffic control plans designed to the California MUTCD. It is submitted through the City’s OPS portal. When proposed grading exceeds 50 cubic yards of earthwork, a grading permit from Engineering is required before any construction starts.
Native oaks
The City’s oak ordinance protects native oaks of six inches diameter at breast height or more and draws a protected zone around each: a circle equal to the largest radius of the dripline plus one foot. Regulated activities inside that zone, such as cutting, grading or trenching that would harm the tree, need a City Tree Permit. A driveway or patio under an oak starts with the City’s Planning Division, which takes those applications, not with the concrete order.
Washing out
The City’s construction-site stormwater page lists concrete truck washout among the construction wastes that must be managed properly to prevent runoff pollution, so plan where the chute and tools are rinsed before the truck arrives. The City notes that flows entering its storm drain system are not treated before they reach local waterways.
Roseville questions
Who fixes a broken sidewalk in front of my house in Roseville?
It depends on what caused the damage. The City says that if an official City street tree or a City vehicle caused it, permanent repairs are scheduled into the City's sidewalk replacement project. If the sidewalk was damaged in any other manner, the property owner is responsible for repairing it. That repair is work in the public right-of-way, and the City lists sidewalk repair among the improvements that need an encroachment permit.
Can I pour early on a Saturday inside Roseville?
Not before 8 am. The City's construction noise rule allows work from 7 am to 7 pm on weekdays, but from 8 am to 8 pm on Saturdays and Sundays.
Is my lot in a floodplain?
Ask before you build. The City's permit-exemption handout asks you to contact Floodplain Management for additional requirements for proposed projects within the City's Regulatory Floodplain or FEMA's SFHA floodplain.
Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.
Sources
Rules change, so check the official page for your own project.
- City of Roseville: Is your address inside City of Roseville limits?, checked November 22, 2026
- Placer County: District Maps and Communities, checked November 22, 2026
- City of Roseville: West Roseville Specific Plan, checked November 22, 2026
- City of Roseville: Gray Park, checked November 9, 2026
- City of Roseville: Permit Exemptions handout (January 2025), checked November 22, 2026
- City of Roseville: Building Permits, checked November 22, 2026
- City of Roseville: Engineering Permits, checked November 22, 2026
- City of Roseville: Sound Walls and Sidewalks, checked November 22, 2026
- City of Roseville: Construction Noise Regulation handout, checked November 22, 2026
- City of Roseville: Oak Tree Ordinance (Open Space Preserve plan, Appendix 40), checked November 22, 2026
- Sacramento County: East Antelope Specific Plan, checked November 22, 2026
- City of Roseville: Ready Mix Concrete best management practices, checked November 22, 2026
- City of Roseville: Stormwater run-off compliance at construction sites, checked November 22, 2026
- USA North 811: submit a ticket before you dig, checked November 9, 2026
How ordering works
Minimum order and load sizes
The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.
Delivery charges
Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.
Scheduling
We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.
Sales tax
Applicable sales tax is determined according to current California tax requirements and the delivery location.
Plan the pour
- Concrete calculatorWork out the cubic yards for a slab, footing, column or steps.
- Residential concreteDriveways, patios, slabs, footings and foundations at home.
- Commercial concreteSlabs, pads, parking areas and foundations for businesses.
- Specialty mixesColored concrete and other mixes to discuss by phone.
More answers, from quotes to hours, are on the concrete delivery FAQ.
Pouring in Roseville?
Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.
Prefer to write? Request a quote online and we will call you back.
