Roseville Star Ready Mix

Service area: Town of Loomis

Ready-mix concrete delivery in Loomis

Ready-mix concrete for driveways, shop and shed slabs, footings and foundations in Loomis and Penryn. Loomis is an incorporated town with its own engineering and building staff. Placer County describes Penryn as an unincorporated area.

Town and county

Loomis was part of unincorporated Placer County until December 17, 1984, when it became a town. Inside town limits, the Town of Loomis handles building, street and grading permits. Penryn, on our delivery list with Loomis, is described by Placer County as an unincorporated area, so the County rules below apply there.

Inside the Town

  • Street work. Any improvement within the right-of-way of a public street, or within a public utility easement, needs an encroachment permit. Engineering issues and inspects encroachment permits, and completed applications can be emailed to the Town.
  • Grading. Engineering issues and inspects grading permits. Grading over 50 cubic yards, grading within a riparian area, or clearing over an acre requires one.
  • Building permits. The Town takes building projects by email, submitted digitally.
  • Trees. The Town’s code has a tree conservation chapter that requires a permit for protected trees. Ask the Town before you dig or pave near a large tree.

Penryn

Penryn sits under the County’s Horseshoe Bar/Penryn Community Plan, which covers 16,560 acres in the Sierra Nevada foothills and aims to preserve the existing rural environment while allowing limited large-lot homes. Any driveway work that reaches into a County-maintained road easement there needs the County encroachment permit described below.

Rules across unincorporated Placer County

These apply in unincorporated Placer County. The County is plain about the line: projects in city limits need permits from the city, not the county.

  • Building permits. Placer County Building Services reviews plans and inspects construction in the unincorporated areas, and has an online portal, eServices. Ask Building Services whether your slab, patio or wall needs a permit before you book the pour.
  • Driveways at the road. An encroachment permit is required for any work within a County-maintained road easement or right-of-way, and the County lists residential driveways among the typical types of work requiring one. The Department of Public Works conditions, issues and inspects these permits. Apply through the County’s online encroachment permit portal, in person at the Auburn or Tahoe City front counters, or by email to the contacts listed on the County’s encroachment page.
  • Grading. The County code lets minor projects grade without a permit when each cut or fill is less than 4 feet deep and the project meets all of the code’s criteria, which include less than 250 cubic yards of graded material in a single area within two years. A grading permit is required for any ground disturbance of one acre or more. The same section also requires a permit for a retaining wall over 4 feet tall, measured from the bottom of the footing to the top of the retained soil.
  • Work hours. The County noise code exempts construction from 6 am to 8 pm Monday through Friday and from 8 am to 8 pm on Saturday and Sunday. The County often attaches a stricter condition to project approvals: construction noise from work that needs a grading or building permit is prohibited on Sundays and federal holidays, and allowed on weekdays from 6 am to 8 pm in daylight saving time or 7 am to 8 pm in standard time, and on Saturdays from 8 am to 6 pm. If your subdivision or project approval carries that condition, it applies to your pour.
  • Washing out. The County’s guidance for concrete work is to wash concrete mixers, trucks, trailers and other equipment in designated washout areas, temporarily block nearby storm drain inlets to keep materials out, and collect slurry residue from the pavement or gutter and remove it from the site.

Loomis and Penryn questions

Does the Town need a permit for grading before a slab?

Over 50 cubic yards, yes. The Town's Engineering page says any grading over 50 cubic yards, any grading in a riparian area, or clearing over an acre needs a grading permit, and Engineering issues and inspects it.

Is Penryn part of Loomis?

No. Placer County describes Penryn as an unincorporated area, so the County rules on this page apply to a Penryn job.

Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.

Sources

Rules change, so check the official page for your own project.

How ordering works

  • Minimum order and load sizes

    The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.

  • Delivery charges

    Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.

  • Scheduling

    We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.

  • Sales tax

    Applicable sales tax is determined according to current California tax requirements and the delivery location.

Other charges, payment, additives and pumps

Plan the pour

More answers, from quotes to hours, are on the concrete delivery FAQ.

Pouring in Loomis?

Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.

Prefer to write? Request a quote online and we will call you back.

Call for QuoteRequest a Quote