Roseville Star Ready Mix

Service area: City of Lincoln

Ready-mix concrete delivery in Lincoln

Ready-mix concrete for homes and job sites in Lincoln, including Twelve Bridges. The City's building permit page covers concrete walks and patios, and its encroachment page spells out what it needs for work at the street.

Walks and patios

Under the question of when you don’t need a permit, the City of Lincoln’s building permit page lists concrete walkways and patios that are not part of an accessible route. It adds that the listed exceptions do not exempt anyone from homeowners association requirements, City zoning and grading requirements, or other City rules, so in a neighborhood with an HOA, check its rules too before the pour. If you are not sure, the City asks you to check with its Building Division before you start.

At the street

The right-of-way is where Lincoln asks for more. If your project includes work in the public right-of-way, which the City says includes the curb and gutter, the sidewalk and public roads, it needs a City encroachment permit. The applicant must request the inspection at least 72 hours before work in the right-of-way begins, so allow for that when you book the delivery. Sort the permit first and book the truck second.

Questions about pouring in Lincoln

Do I need a permit to pour next to the street in Lincoln?

Yes, if the work is in the public right-of-way. The City of Lincoln says the right-of-way includes the curb and gutter, the sidewalk, public roads, City-owned land and City easements, and work there needs a City encroachment permit.

What does the Lincoln encroachment permit ask for?

An application signed on both pages, and a certificate of insurance that lists the City of Lincoln as additionally insured and certificate holder. If your work will block roadways or sidewalks, traffic control plans are required too.

How do I send in the application and pay the fees?

The City takes the completed application, certificate of insurance and supporting documents by email, in a locked drop box on the 3rd floor of City Hall, or by mail to Engineering. Fees are determined during application review. Engineering staff send an invoice, which you can pay by credit card through the online payment portal or by check. The City adds that not having an active business license will delay processing.

Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.

Sources

Rules change, so check the official page for your own project.

How ordering works

  • Minimum order and load sizes

    The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.

  • Delivery charges

    Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.

  • Scheduling

    We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.

  • Sales tax

    Applicable sales tax is determined according to current California tax requirements and the delivery location.

Other charges, payment, additives and pumps

Plan the pour

More answers, from quotes to hours, are on the concrete delivery FAQ.

Pouring in Lincoln?

Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.

Prefer to write? Request a quote online and we will call you back.

Call for QuoteRequest a Quote