Roseville Star Ready Mix

Service area: City of Rocklin

Ready-mix concrete delivery in Rocklin

Ready-mix concrete for homes and job sites in Rocklin, including the Sunset and Whitney Ranch areas. Rocklin is a city, and building permit applications and plans must be submitted online through eTRAKiT.

Permits online

Inside city limits, the City of Rocklin takes both building permit and encroachment permit applications through its online eTRAKiT portal. The City says all building permit applications and plan submittals must be submitted online.

If your pour is a driveway or a sidewalk, read what the City says about permits below before you book the delivery.

At the street

The City says an encroachment permit is needed when anyone, residents and contractors included, works in the City right-of-way, on City-owned land or within a City easement. Applications start in the City’s eTRAKiT portal, with two copies of traffic or pedestrian control plans if the work is on City roadways, and the City’s requirements sheet asks for general liability, automobile and workers’ compensation insurance.

Weekend hours

Rocklin’s construction noise guidelines say no noise on weekdays before 7 am or after 7 pm, and no noise on weekends before 8 am or after 7 pm. So for a weekend pour, plan for the work to start no earlier than 8 am.

Oaks

Rocklin requires a permit before any oak of 6 inches or more in diameter is removed. The City’s oak preservation guidelines add that paving within the driplines of oaks should be avoided whenever possible, so plan a driveway or patio outside the canopy where you can.

Rocklin questions

Do I need a building permit for a new driveway in Rocklin?

It may not. Among the projects for which the City of Rocklin says a building permit may not be required, it lists sidewalks and driveways not more than 30 inches above adjacent grade, not over any basement or story below, and not part of an accessible route. Check the City permit page for your project before you book the pour.

What about work next to the street?

Even when no building permit is needed, the City says driveway and sidewalk work may require an encroachment permit from its Public Services department. Ask them before the forms go in if your pour meets the curb or the public sidewalk.

Do I need a permit to take out an oak for a new patio?

Yes, if the oak is 6 inches or more in diameter. The City requires a permit before any oak of that size is removed.

Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.

Sources

Rules change, so check the official page for your own project.

How ordering works

  • Minimum order and load sizes

    The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.

  • Delivery charges

    Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.

  • Scheduling

    We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.

  • Sales tax

    Applicable sales tax is determined according to current California tax requirements and the delivery location.

Other charges, payment, additives and pumps

Plan the pour

More answers, from quotes to hours, are on the concrete delivery FAQ.

Pouring in Rocklin?

Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.

Prefer to write? Request a quote online and we will call you back.

Call for QuoteRequest a Quote