Service area: City of Rancho Cordova
Ready-mix concrete delivery in Rancho Cordova
Ready-mix concrete for homes, contractors and businesses in Rancho Cordova, Gold River and Mather. The three sit side by side but do not share a rulebook: Rancho Cordova is a city, Gold River is county, and Mather is split between the two.
City, county, or both
Rancho Cordova incorporated as a city on July 1, 2003, and its boundaries were drawn differently from the County’s older planning area. That leaves three situations on our delivery list:
- Rancho Cordova: City permits. The City says all its permits are available online, through Rancho Cordova Online.
- Gold River: outside the city. The County’s plan for the area names Gold River among the neighborhoods left out of the new city, and its zoning is a County ordinance. County permits and the county-wide rules below apply.
- Mather: split. The County’s Mather Field ordinance says a majority of the Main Base District and its two subareas is within the jurisdiction of the City. Land that is now City jurisdiction has been excised from the County’s revised plan, and the County’s standards apply only to the areas still under County jurisdiction. Check the parcel before you look up a permit.
Street work inside the city
Work in a City street is done to the satisfaction of the Public Works Director, under the City’s standard requirements for encroachment projects. Several of those requirements decide when a truck can come:
- No parking or storing equipment or materials in traffic lanes or the public right-of-way.
- At schools affected by the work, when school is in session, no construction activities for 30 minutes before and 30 minutes after the morning arrival and afternoon departure bells.
- No lane or road closures from 7 am to 9 pm at the locations the requirements list.
- The contractor tells the City inspector before paving.
If an apron or sidewalk pour sits near a school or on a busy street, plan the delivery time around those rules before you call.
Gold River at Sunrise Boulevard
In Gold River, the County’s planning ordinance allows no curb cuts for private access directly onto Sunrise Boulevard, so a driveway there connects to a side street.
Rules across unincorporated Sacramento County
These are Sacramento County’s rules. Its zoning standards cover the unincorporated area of the County, and its tree permit page says anyone who lives in a City within Sacramento County needs to contact the City for tree permits. Not sure which side of a city line the job is on? The County points people to its Parcel Viewer, where the cities on the map are colored and labeled.
- Driveways and sidewalks on your lot. The County’s list of residential work that needs no building permit includes sidewalks and driveways. Ask Building Permits and Inspection whether a patio slab needs a permit. Where a permit is needed, the County asks for an inspection before concrete is placed.
- Work in the street. A County encroachment permit is required for new driveways, driveway repairs, and new or repaired sidewalks in the public right-of-way. Submit the request to the County’s Site Improvement and Permits Section by email or at the public front counter at 827 7th Street.
- Front-yard paving. The zoning code limits paving and hardscape in the required front and side street yards. On lots of 15,000 net square feet or less, vehicle parking areas in the required front yard, the required side street yard, and the area between the house and the street must have impervious, continuously paved surfacing such as concrete. A concrete ribbon or gravel driveway can lead to a concrete parking pad, and each space must be at least 9 feet wide and 19 feet long. On lots over 15,000 net square feet, the code encourages permeable paving for parking areas instead of impervious surfacing.
- Native oaks. Removing or pruning a native oak on any property, including a private home, needs a County tree permit. For branches, limbs or roots over 2 inches in diameter, the County requires an ISA Certified Arborist or ISA Certified Tree Worker. The County’s protective measures for construction around oaks say no vehicles, equipment, supplies or materials shall be driven, parked, stockpiled or located within the driplines of the oak trees, so plan where the truck will stand before the day of the pour.
- Work hours. The County noise code exempts construction and paving noise from its limits when the work stays between 6 am and 8 pm on weekdays and 7 am and 8 pm on weekends.
- Grading. A County grading permit is needed to move 350 cubic yards of soil or more, or to clear an acre or more. Footings authorized by a valid building permit are excluded.
- Washing out. The County lists wash water from trucks, mixers and hand tools among construction pollutants and says the property owner is ultimately responsible. Hosing spills into a storm drain is prohibited.
Rancho Cordova questions
Is Gold River part of Rancho Cordova?
No. The County's Cordova Community Plan names Gold River among the neighborhoods outside the boundaries of the new city, and Gold River's zoning is a Sacramento County ordinance. Permits there come from the County.
Can a Gold River lot have a driveway onto Sunrise Boulevard?
No. The County's Gold River special planning area ordinance says there shall be no curb cuts for private access directly onto Sunrise Boulevard.
Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.
Sources
Rules change, so check the official page for your own project.
- City of Rancho Cordova: About Our City, checked November 22, 2026
- Sacramento County: Cordova Community Plan, checked November 22, 2026
- Sacramento County: Gold River Special Planning Area, checked November 22, 2026
- Sacramento County: Mather Field Special Planning Area, checked November 22, 2026
- City of Rancho Cordova: Building and Safety, checked November 22, 2026
- City of Rancho Cordova: Standard Requirements for Encroachment Projects, checked November 22, 2026
- Sacramento County Building Permits and Inspection: residential work exempt from permit (GI-21), checked November 22, 2026
- Sacramento County Building Permits and Inspection: Frequently Asked Questions, checked November 22, 2026
- Sacramento County Engineering: Encroachment Permits, checked November 22, 2026
- Sacramento County Zoning Code, Chapter 5, checked November 22, 2026
- Sacramento County Planning: Tree Permits, checked November 22, 2026
- Sacramento County: protective measures for construction around oaks, checked November 22, 2026
- Sacramento County Environmental Management: Noise Control Program, checked November 22, 2026
- Sacramento County Engineering: Grading Permits, checked November 22, 2026
- Sacramento County Water Resources: construction pollutants, checked November 22, 2026
- Sacramento County Environmental Management: stormwater best management practices, checked November 22, 2026
- USA North 811: submit a ticket before you dig, checked November 9, 2026
How ordering works
Minimum order and load sizes
The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.
Delivery charges
Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.
Scheduling
We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.
Sales tax
Applicable sales tax is determined according to current California tax requirements and the delivery location.
Plan the pour
- Concrete calculatorWork out the cubic yards for a slab, footing, column or steps.
- Residential concreteDriveways, patios, slabs, footings and foundations at home.
- Commercial concreteSlabs, pads, parking areas and foundations for businesses.
- Specialty mixesColored concrete and other mixes to discuss by phone.
More answers, from quotes to hours, are on the concrete delivery FAQ.
Pouring in Rancho Cordova?
Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.
Prefer to write? Request a quote online and we will call you back.
