Roseville Star Ready Mix

Service area: Unincorporated Sacramento County

Ready-mix concrete delivery in Fair Oaks

Ready-mix concrete for driveways, patios, footings and slabs in Fair Oaks, including Fair Oaks Village. Fair Oaks is not a city, so Sacramento County sets the rules for your pour, and the Village has two ordinances of its own.

Who sets the rules

Fair Oaks is an unincorporated community. The County’s 1975 community plan bounds it, for planning purposes, by the American River on the south, San Juan Avenue on the west, Madison Avenue on the north and the Blue Ravine drainage on the east. The County provides development services to its unincorporated areas, so building permits, street encroachment permits and tree permits come from Sacramento County. The City of Citrus Heights borders Fair Oaks. It has been a city since 1997, and services inside a city come from its own departments, so a job across that line follows the city’s rules instead.

Fair Oaks Village streets

The Village has its own County ordinance, the Fair Oaks Village Neighborhood Preservation Area. It describes existing narrow streets frequently used for walking, very few curbs, gutters or sidewalks, and an abundance of large, mature trees. Before building permits and other approvals, it says existing streets shall be maintained without curbs, gutters and sidewalks, wherever possible.

So on a Village lot a new driveway can run to the edge of the pavement rather than to a concrete curb. If the apron is in the public right-of-way, the County encroachment permit applies, and it is worth asking the County how it wants the apron finished before the forms go in.

Lot coverage in the Village

The same ordinance caps lot coverage. Single-story homes on lots under a quarter acre can cover up to 40 percent, two-story homes on lots under a quarter acre up to 33 percent, and single- or two-story homes on lots of a quarter acre or more up to 25 percent. Detached garages count, so this matters for an addition or a garage on a new foundation. The ordinance leaves patio covers, decks and pools out of the count.

The Village commercial center

A second County ordinance, the Fair Oaks Village Special Planning Area, carries out community plan goals for keeping the Village area a viable commercial center. It describes the terrain in the Fair Oaks Village area as hilly and tree-covered. Grading there has to be minimal to keep the natural terrain, a detailed grading plan needs approval by the Commission and the Department of Public Works before any grading, and trees cannot be removed without the Commission’s approval. Contractors pricing a slab, footing or parking area inside the Special Planning Area should allow for that review before booking the concrete.

Rules across unincorporated Sacramento County

These are Sacramento County’s rules. Its zoning standards cover the unincorporated area of the County, and its tree permit page says anyone who lives in a City within Sacramento County needs to contact the City for tree permits. Not sure which side of a city line the job is on? The County points people to its Parcel Viewer, where the cities on the map are colored and labeled.

  • Driveways and sidewalks on your lot. The County’s list of residential work that needs no building permit includes sidewalks and driveways. Ask Building Permits and Inspection whether a patio slab needs a permit. Where a permit is needed, the County asks for an inspection before concrete is placed.
  • Work in the street. A County encroachment permit is required for new driveways, driveway repairs, and new or repaired sidewalks in the public right-of-way. Submit the request to the County’s Site Improvement and Permits Section by email or at the public front counter at 827 7th Street.
  • Front-yard paving. The zoning code limits paving and hardscape in the required front and side street yards. On lots of 15,000 net square feet or less, vehicle parking areas in the required front yard, the required side street yard, and the area between the house and the street must have impervious, continuously paved surfacing such as concrete. A concrete ribbon or gravel driveway can lead to a concrete parking pad, and each space must be at least 9 feet wide and 19 feet long. On lots over 15,000 net square feet, the code encourages permeable paving for parking areas instead of impervious surfacing.
  • Native oaks. Removing or pruning a native oak on any property, including a private home, needs a County tree permit. For branches, limbs or roots over 2 inches in diameter, the County requires an ISA Certified Arborist or ISA Certified Tree Worker. The County’s protective measures for construction around oaks say no vehicles, equipment, supplies or materials shall be driven, parked, stockpiled or located within the driplines of the oak trees, so plan where the truck will stand before the day of the pour.
  • Work hours. The County noise code exempts construction and paving noise from its limits when the work stays between 6 am and 8 pm on weekdays and 7 am and 8 pm on weekends.
  • Grading. A County grading permit is needed to move 350 cubic yards of soil or more, or to clear an acre or more. Footings authorized by a valid building permit are excluded.
  • Washing out. The County lists wash water from trucks, mixers and hand tools among construction pollutants and says the property owner is ultimately responsible. Hosing spills into a storm drain is prohibited.

Fair Oaks questions

Do the Fair Oaks Village rules cover my whole street?

Not necessarily. The Neighborhood Preservation Area ordinance applies only to properties zoned RD-5 and RD-5 (PC) as shown on its boundary map. The Special Planning Area applies to the properties its exhibits describe, which include a Commercial District. Ask the County Planning office, or look up the parcel on the County map, before you plan around either one.

Does a new patio count toward the Village lot-coverage limit?

The ordinance leaves covered porches, patio covers, gazebos, decks and pools out of the coverage calculation. If your plan is close to the limit, confirm with the County whether an open patio slab counts.

Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.

Sources

Rules change, so check the official page for your own project.

How ordering works

  • Minimum order and load sizes

    The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.

  • Delivery charges

    Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.

  • Scheduling

    We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.

  • Sales tax

    Applicable sales tax is determined according to current California tax requirements and the delivery location.

Other charges, payment, additives and pumps

Plan the pour

More answers, from quotes to hours, are on the concrete delivery FAQ.

Pouring in Fair Oaks?

Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.

Prefer to write? Request a quote online and we will call you back.

Call for QuoteRequest a Quote