Service area: City of Folsom
Ready-mix concrete delivery in Folsom
Ready-mix concrete for homes and job sites across Folsom, on both sides of Highway 50. Both sides are in the City of Folsom, which has its own rules for work near oaks, in the street and on weekends.
Both sides of Highway 50
Folsom voters approved Measure W in 2004. On January 18, 2012, the City annexed about 3,600 acres south of its former city limits and Highway 50. Inside city limits, on either side of the highway, the City issues the permits. Its eTRAKiT system can be used for most minor building permits.
Oaks and the tree protection zone
Folsom’s tree code protects native oak trees, along with heritage, landmark and regulated trees. It draws a tree protection zone around each one: the outer edge of the critical root zone or the dripline radius, whichever is greater, plus one foot. Grading, trenching, paving or soil disturbance inside that zone is a regulated activity, and a tree work permit is required for it unless the code exempts the work. Installing a driveway, walkway or other impervious surface inside the zone is prohibited unless the City specifically approves it.
On a lot with a mature oak near the street, measure from the trunk before you settle where a driveway or patio goes.
Weekend pours
The City’s noise code exempts construction noise from 7 am to 6 pm on any day except Saturday or Sunday, but only from 8 am to 5 pm on Saturday and Sunday. If you want a Saturday delivery in Folsom, ask for 8 am or later.
At the street
Folsom’s code makes it unlawful to place or keep any encroachment on, over or under public property without an encroachment permit. The City’s permit contract requires written approval before any street is closed or lane is blocked. It also keeps all marked lanes on major streets open in each direction during the peak traffic hours of 6 to 8 am and 3:30 to 5:30 pm. If a pour needs a lane blocked, plan it outside those hours.
Walls, grading and the historic district
- Retaining walls: the City’s retaining wall handout lists cantilever or segmental gravity walls with an exposed height of three feet or less under a permit exception. Check the handout before you rely on it.
- Grading: fill of more than 50 cubic yards on one lot needs a grading permit.
- Historic District: design review is required for all new structures and alterations to existing ones, so check with the City before work in the district.
Folsom questions
Can I take a Saturday 7 am delivery in Folsom?
Check the noise rule first. Folsom exempts construction noise on Saturday and Sunday only from 8 am to 5 pm, an hour later than its 7 am weekday start, so ask for a Saturday delivery at 8 am or later.
Is a new driveway near an oak allowed in Folsom?
Only with the City's approval. Native oaks are among the trees Folsom protects, and its tree code prohibits installing impervious surfaces, including driveways and walkways, inside a protected tree's protection zone unless the City specifically approves it.
Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.
Sources
Rules change, so check the official page for your own project.
- City of Folsom: Folsom Plan Area history, checked November 22, 2026
- City of Folsom: Operating Budget FY 2012-13, annexation of the Folsom Plan Area, checked November 22, 2026
- City of Folsom: ePermit Center, checked November 22, 2026
- Folsom Municipal Code Chapter 8.42, Noise Control, checked November 9, 2026
- Folsom Municipal Code Chapter 12.16, Tree Preservation, checked November 9, 2026
- Folsom Municipal Code Chapter 12.20, Use of City Property, checked November 9, 2026
- City of Folsom: Encroachment Permit Contract, checked November 22, 2026
- City of Folsom: Retaining Walls permit application, checked November 22, 2026
- Folsom Municipal Code Chapter 14.29, Grading, checked November 9, 2026
- Folsom Municipal Code Chapter 17.52, Historic District, checked November 9, 2026
- USA North 811: submit a ticket before you dig, checked November 9, 2026
How ordering works
Minimum order and load sizes
The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.
Delivery charges
Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.
Scheduling
We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.
Sales tax
Applicable sales tax is determined according to current California tax requirements and the delivery location.
Plan the pour
- Concrete calculatorWork out the cubic yards for a slab, footing, column or steps.
- Residential concreteDriveways, patios, slabs, footings and foundations at home.
- Commercial concreteSlabs, pads, parking areas and foundations for businesses.
- Specialty mixesColored concrete and other mixes to discuss by phone.
More answers, from quotes to hours, are on the concrete delivery FAQ.
Pouring in Folsom?
Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.
Prefer to write? Request a quote online and we will call you back.