Service area: Unincorporated Sacramento County
Ready-mix concrete delivery in Rio Linda
Ready-mix concrete for driveways, shop slabs, footings and foundations on Rio Linda and Elverta properties. Both communities are unincorporated and share one County plan that aims to retain their rural character, which shapes what goes in at the street and where you can build.
One plan for two rural communities
Rio Linda and Elverta are unincorporated and share the County’s Rio Linda and Elverta Community Plan. Its guiding principles include retaining the rural character of the communities and maintaining agricultural and agricultural-residential uses. McClellan Park borders Rio Linda to the southeast.
At the street
The plan’s guidance on streets and driveways says the design of local streets in agricultural-residential areas shall consider the retention of rural character, and that sidewalks and curbs may not be appropriate or consistent with it. Where there is no curb, check whether the driveway apron sits in the County right-of-way. If it does, the County encroachment permit below applies.
In Downtown Rio Linda, a County ordinance says the north-south neighborhood streets adjoining M Street vary from streets with curb, gutter and sidewalk to more rural roads with no sidewalks, and that neighborhood streets there shall be maintained in their rural appearance. Along M Street itself, the right-of-way is to be improved with features that include a sidewalk and landscape zone at least 8 feet wide. Frontage work there follows that ordinance.
Floodways and floodplains
Dry Creek matters for anything with a foundation. The plan says building permits for new construction of habitable structures shall not be granted inside the Dry Creek floodway, as the County Water Resources Division defines it. It also aims to prevent encroachment by fill or building into the floodplains of the tributaries of the Natomas East Main Drainage Canal and Rohla Creek, unless compensating flood storage capacity acceptable to the Water Resources Division is provided. Part of Downtown Rio Linda, its East Neighborhood Area, is inside the Dry Creek 100-year floodplain. Check the parcel with the County Water Resources Division before you plan a building pad or bring in fill.
Old septic tanks and wells
The plan notes existing urban subdivisions that are still on private septic systems, and it says future development shall identify existing septic tanks and water wells and abandon them according to State and County requirements. If you are adding a building or a large slab on an older lot, find them before the footings are dug.
Rules across unincorporated Sacramento County
These are Sacramento County’s rules. Its zoning standards cover the unincorporated area of the County, and its tree permit page says anyone who lives in a City within Sacramento County needs to contact the City for tree permits. Not sure which side of a city line the job is on? The County points people to its Parcel Viewer, where the cities on the map are colored and labeled.
- Driveways and sidewalks on your lot. The County’s list of residential work that needs no building permit includes sidewalks and driveways. Ask Building Permits and Inspection whether a patio slab needs a permit. Where a permit is needed, the County asks for an inspection before concrete is placed.
- Work in the street. A County encroachment permit is required for new driveways, driveway repairs, and new or repaired sidewalks in the public right-of-way. Submit the request to the County’s Site Improvement and Permits Section by email or at the public front counter at 827 7th Street.
- Front-yard paving. The zoning code limits paving and hardscape in the required front and side street yards. On lots of 15,000 net square feet or less, vehicle parking areas in the required front yard, the required side street yard, and the area between the house and the street must have impervious, continuously paved surfacing such as concrete. A concrete ribbon or gravel driveway can lead to a concrete parking pad, and each space must be at least 9 feet wide and 19 feet long. On lots over 15,000 net square feet, the code encourages permeable paving for parking areas instead of impervious surfacing.
- Native oaks. Removing or pruning a native oak on any property, including a private home, needs a County tree permit. For branches, limbs or roots over 2 inches in diameter, the County requires an ISA Certified Arborist or ISA Certified Tree Worker. The County’s protective measures for construction around oaks say no vehicles, equipment, supplies or materials shall be driven, parked, stockpiled or located within the driplines of the oak trees, so plan where the truck will stand before the day of the pour.
- Work hours. The County noise code exempts construction and paving noise from its limits when the work stays between 6 am and 8 pm on weekdays and 7 am and 8 pm on weekends.
- Grading. A County grading permit is needed to move 350 cubic yards of soil or more, or to clear an acre or more. Footings authorized by a valid building permit are excluded.
- Washing out. The County lists wash water from trucks, mixers and hand tools among construction pollutants and says the property owner is ultimately responsible. Hosing spills into a storm drain is prohibited.
Questions about pouring in Rio Linda
Can I pour a slab for a new building in the Dry Creek floodplain?
Not for new construction of a habitable structure inside the Dry Creek floodway, as the County Water Resources Division defines it. The community plan says building permits for that shall not be granted. The plan also aims to prevent encroachment by fill or building into the floodplains of the NEMDC tributaries and Rohla Creek, unless compensating flood storage capacity acceptable to the Water Resources Division is provided. Ask the Division before you plan the pad.
Do Rio Linda streets need curbs and sidewalks?
Not always. For local streets in agricultural-residential areas, the community plan says sidewalks and curbs may not be appropriate or consistent with rural character. The Downtown Rio Linda ordinance says its neighborhood streets shall be maintained in their rural appearance. Sidewalk and driveway work in the public right-of-way needs a County encroachment permit.
Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.
Sources
Rules change, so check the official page for your own project.
- Sacramento County: Rio Linda and Elverta Community Plan, checked November 22, 2026
- Sacramento County: Downtown Rio Linda Special Planning Area, checked November 22, 2026
- Sacramento County: McClellan Park Special Planning Area, checked November 22, 2026
- City of Sacramento 2040 General Plan: Special Study Areas, checked November 22, 2026
- Sacramento County: Development Guide (2024), checked November 22, 2026
- Sacramento County Engineering: Encroachment Permits, checked November 22, 2026
- Sacramento County Building Permits and Inspection: residential work exempt from permit (GI-21), checked November 22, 2026
- Sacramento County Building Permits and Inspection: Frequently Asked Questions, checked November 22, 2026
- Sacramento County Zoning Code, Chapter 5, checked November 22, 2026
- Sacramento County Planning: Tree Permits, checked November 22, 2026
- Sacramento County: protective measures for construction around oaks, checked November 22, 2026
- Sacramento County Environmental Management: Noise Control Program, checked November 22, 2026
- Sacramento County Engineering: Grading Permits, checked November 22, 2026
- Sacramento County Water Resources: construction pollutants, checked November 22, 2026
- Sacramento County Environmental Management: stormwater best management practices, checked November 22, 2026
- USA North 811: submit a ticket before you dig, checked November 9, 2026
How ordering works
Minimum order and load sizes
The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.
Delivery charges
Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.
Scheduling
We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.
Sales tax
Applicable sales tax is determined according to current California tax requirements and the delivery location.
Plan the pour
- Concrete calculatorWork out the cubic yards for a slab, footing, column or steps.
- Residential concreteDriveways, patios, slabs, footings and foundations at home.
- Commercial concreteSlabs, pads, parking areas and foundations for businesses.
- Specialty mixesColored concrete and other mixes to discuss by phone.
More answers, from quotes to hours, are on the concrete delivery FAQ.
Pouring in Rio Linda?
Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.
Prefer to write? Request a quote online and we will call you back.