Service area: Unincorporated El Dorado County
Ready-mix concrete delivery in Cameron Park
Ready-mix concrete for homes and job sites in Cameron Park, Shingle Springs and Rescue. All three are unincorporated El Dorado County, and over 80 Cameron Park neighborhoods add a design review of their own through the Community Services District.
The Community Services District
Cameron Park has a layer of its own. The Cameron Park Community Services District’s CC&R Department and Architectural Review Committee perform design review and enforcement for over 80 neighborhoods and nearly 8,000 homes. In those neighborhoods the CC&Rs require new homes, improvements, paint, fencing, additions and similar work to be approved by the committee, and the committee’s procedures cover any and all exterior improvements to the dwelling or property.
What that means for concrete:
- The committee’s application requires a site plan for new homes and for projects involving patios, decking, fencing and room additions, among others.
- If any work starts before approval, the fees are doubled.
- The committee meets bi-weekly on Tuesdays. Applications, plans and payment are due by end of business on the Tuesday before the meeting, so build that schedule into the job.
- Committee approval does not replace a County permit where one is required.
For what is acceptable on a given lot, the CSD says to consult the CC&Rs for that parcel. In a CSD neighborhood, check with the committee before a new driveway or slab.
Fire plot plans for new homes
For a new single-family home, the Cameron Park Fire Department’s plot plan has to show the driveway: its location, width, length, surfacing, profile, angle of approach and departure, and grades, along with any required turnouts and turnarounds. The surfacing on that plan is the concrete you will order, so settle it before you call us.
Shingle Springs and Rescue
Shingle Springs and Rescue are not cities either. El Dorado County has two, South Lake Tahoe and Placerville, so the County rules below apply in both places. Rescue is served by its own fire department, which covers about 30 square miles.
Rules across unincorporated El Dorado County
El Dorado County has two incorporated cities, Placerville and South Lake Tahoe. The rest of the County’s residents live outside those two incorporated areas.
- Building permits. The County Building Division takes applications for basic building permits through its e-TRAKiT permitting system, though not all permit types are currently available through it.
- Driveways at the road. Work in a County-maintained road easement or right-of-way needs an encroachment permit from the Department of Transportation. A driveway that connects to a road with a speed limit of 25 mph or less is permitted by the Building Department instead.
- Insurance. The County’s insurance requirements for an encroachment permit list a certificate of commercial general liability insurance, with coverage of not less than $1,000,000 combined single limit per occurrence. The County of El Dorado, its officers, officials, employees and volunteers must be included as additional insured.
- Inspection before the pour. On a concrete driveway under a Department of Transportation encroachment permit, call for the forms inspection when the forms are ready for the pour, before the concrete is poured. Calls must be received before 7 am for a same-day inspection. The encroachment permit has to be finaled before the final inspection on the building permit.
- Grading. Grading for a single-family home or accessory structure is exempt from a grading permit when it conforms to all of the County’s design parameters. They include less than 250 cubic yards of graded material, cuts under 5 feet, fills under 3 feet and less than 10,000 square feet of soil disturbance. Fills also cannot be intended to support structural improvements, including flatwork concrete and driveways.
- Oaks. The County’s Oak Resources Conservation Ordinance applies to privately owned land in the unincorporated county. Oaks with a single main trunk less than 6 inches in diameter are exempt from its permit and mitigation.
- Work hours. The County says there is no county-wide ordinance on construction start times, though the Sheriff’s Office can respond to a construction noise complaint.
Cameron Park questions
Does a new patio slab in Cameron Park need CSD approval?
In a CSD neighborhood, ask the committee first. Its procedures cover any and all exterior improvements to the dwelling or property, and its application requires a site plan for projects involving patios, among others. Read your CC&Rs or ask the CSD before you book the pour.
Does CSD approval replace a County permit?
No. The CSD's own procedures say approval by its architectural committee does not constitute approval by the County, where County approval is required.
Digging for footings or a slab base? Contact USA North 811, the notification center for Northern California, by calling 811 or online. It asks for at least two working days' notice before digging starts.
Sources
Rules change, so check the official page for your own project.
- County of El Dorado: About Us, checked November 22, 2026
- Cameron Park Community Services District: Resident Rules and CC&Rs, checked November 22, 2026
- Cameron Park Community Services District: Architectural Review Committee procedures, checked November 22, 2026
- Cameron Park Community Services District: ARC Application 2026, checked November 22, 2026
- Cameron Park Community Services District: Architectural Review Committee, checked November 22, 2026
- Cameron Park Fire Department: Single-Family Dwelling Plot Plan Requirements, checked November 22, 2026
- Rescue Fire Department: Department Information, checked November 22, 2026
- County of El Dorado: Building Services Hub, checked November 22, 2026
- County of El Dorado Department of Transportation: Encroachment Permits, checked November 22, 2026
- County of El Dorado: Insurance Requirements to Obtain an Encroachment Permit, checked November 22, 2026
- County of El Dorado Department of Transportation: Inspection Instructions, checked November 22, 2026
- County of El Dorado: Grading Permit, checked November 22, 2026
- County of El Dorado: Oak Resources Conservation Ordinance, checked November 22, 2026
- County of El Dorado: Code Enforcement FAQ, checked November 22, 2026
- USA North 811: submit a ticket before you dig, checked November 9, 2026
How ordering works
Minimum order and load sizes
The minimum order is 1 cubic yard. Loads of 1 to 4.5 cubic yards are short loads, and one truck carries up to 9.5 cubic yards.
Delivery charges
Orders of 5 cubic yards or more within 20 miles of our yard, measured by driving distance, have no delivery charge. Smaller orders pay a short-load delivery fee, and orders delivered farther than 20 miles pay a delivery fee; both depend on the quantity and the distance. Every order also pays an environmental fee for each truckload and a surcharge by the ton; we confirm the amounts when you call for a quote.
Scheduling
We fit your delivery in as soon as the schedule allows. For large orders, we recommend calling 48 hours ahead.
Sales tax
Applicable sales tax is determined according to current California tax requirements and the delivery location.
Plan the pour
- Concrete calculatorWork out the cubic yards for a slab, footing, column or steps.
- Residential concreteDriveways, patios, slabs, footings and foundations at home.
- Commercial concreteSlabs, pads, parking areas and foundations for businesses.
- Specialty mixesColored concrete and other mixes to discuss by phone.
More answers, from quotes to hours, are on the concrete delivery FAQ.
Pouring in Cameron Park?
Call with the job-site address and what you are pouring. We will confirm delivery, pricing and a window.
Prefer to write? Request a quote online and we will call you back.